Project Description

GBL5

St. Ghislain Belgium

Programme: May 22 – May 23

Value: €1,200,000

Scope Of Works

Scope of Works

In these projects, we successfully installed the following:

  • Water Services: installation of complete water supply systems including CWS,HWS,HWSR & MWS.
  • Seismic Bracketry for FCUs: Installation of complex support bracketry for fan coil units (FCUs) to meet with seismic design criteria.
  • LTHW and Chilled Water Systems: Installation of Low Temperature Hot Water (LTHW) and chilled water systems (CHW)  piping systems.
  • Drainage Systems: Installation of all drainage & wastewater piping systems.
  • Sanitary Ware: Complete installation of sanitary ware to meet welfare standards.

Design: PM Group                                                                                                                 Reference: Jones Engineering