Project Description
GBL5
St. Ghislain Belgium
Programme: May 22 – May 23
Value: €1,200,000
Scope Of Works
Scope of Works
In these projects, we successfully installed the following:
- Water Services: installation of complete water supply systems including CWS,HWS,HWSR & MWS.
- Seismic Bracketry for FCUs: Installation of complex support bracketry for fan coil units (FCUs) to meet with seismic design criteria.
- LTHW and Chilled Water Systems: Installation of Low Temperature Hot Water (LTHW) and chilled water systems (CHW) piping systems.
- Drainage Systems: Installation of all drainage & wastewater piping systems.
- Sanitary Ware: Complete installation of sanitary ware to meet welfare standards.
Design: PM Group Reference: Jones Engineering